The client in this project was looking to relocate all of their pallet racking and infrastructure to a new site 120 miles away.

Industry

Confidential

Deliverables

Racking Dismantling

Frame Modification

Pallet Racking relocation

Timescale

2 weeks

Warehouse Dilapidation
Warehouse Dilapidation

What We Did

Delivered to the new site within two weeks

PD Industrial set about designing a new layout for the client utilising their existing pallet racking. We then dismantled all the pallet racking, modified the frames and delivered to the new site within two weeks. The new pallet racking was then installed at the new site and signed off to SEMA standards. A job like this can be handled with ease – but only with the right expertise and experience in the field.