Reloskate3PL & Logistics


B&M's The Vault needed a fundamental change to its storage layout — from very narrow aisle (VNA) racking to a wide-aisle configuration with higher load capacity. The complication was the in-rack sprinkler system: removing and reinstalling sprinklers is costly, slow and leaves parts of the warehouse without full fire protection while the work is under way.
The project had to move and replace racking around the live sprinkler installation without taking it out.
PD Industrial used Reloskate to relocate whole runs of racking into their new positions without dismantling them. Racks could be repositioned while sprinkler drop-arms and the suppression system stayed intact — avoiding a major extra phase of contractor work and programme risk.
At the same time, frames and beams were replaced and upgraded so every level can safely hold 2,300 kg. Twenty-three double-entry VNA runs were converted into 16 double-entry wide-aisle runs, giving B&M a layout built for their current handling and load requirements.
B&M now has a wide-aisle racking layout with higher load capacity at The Vault. Using Reloskate kept fire protection continuous, avoided sprinkler contractor costs and downtime, and delivered the reconfiguration without the disruption of a conventional dismantle-and-rebuild.