Boohoo — 10× Storage Locations, Against the Clock

Boohoo — 10× Storage Locations, Against the Clock

Boohoo — 10× Storage Locations, Against the Clock

The Pressure of Fast Fashion

Few sectors move faster than fast fashion. Boohoo's warehouse operations exist to serve a customer base that expects next-day delivery on thousands of SKUs — and that expectation doesn't pause while you refurbish your storage infrastructure.

When Boohoo came to PD Industrial, the challenge was clear and the stakes were high. Their existing mezzanine was outdated and their shelving system couldn't accommodate the SKU count that their product range now demanded. The gap between their current storage capability and their operational requirement was widening by the month.

They needed a new mezzanine floor and an entirely new shelving system, capable of delivering a step-change in SKU locations. They needed it designed, procured, and installed inside a 12-week window. And this was the period of post-pandemic supply chain disruption when lead times across the racking industry had ballooned to three, four, sometimes five months.

How Manufacturer Independence Changed the Timeline

This is where being trade-only and manufacturer-independent proved its value in the most concrete possible way. Where our competitors were locked into single-manufacturer supply chains with 16-week lead times, PD Industrial's access to the whole market allowed us to source the required shelving components within a timeframe that kept the project on programme.

The site assessment established the structural constraints of the existing building, the mezzanine loadings required for the new shelving specification, and the exact configuration needed to maximise SKU locations within the available footprint. The design was produced, approved, and procurement initiated — all within a timescale that a manufacturer-aligned competitor simply could not have matched.

The Outcome

Twelve weeks later, Boohoo had a new mezzanine and a new shelving system. Their SKU storage locations increased tenfold — not an incremental improvement, a transformation. And the project was completed within budget, despite the supply chain conditions that forced most of their competitors to accept delays.

Completed on time and within budget, despite significant supply chain challenges during the project period.