Norbar — Mezzanine & Warehouse Partitioning

Norbar — Mezzanine & Warehouse Partitioning

Norbar — Mezzanine & Warehouse Partitioning

The Challenge of Growing Without Moving

Norbar Torque Tools are world-renowned — if you've used a precision torque wrench, there's a good chance it was made or calibrated to a Norbar standard. Their facility reflects that precision: a state-of-the-art environment built for the development of new designs and the testing of intricate engineering.

The problem, as the business grew, was space. Success was beginning to crowd out the conditions that created it. More orders meant more testing cycles, more staff, more equipment — and all of it competing for the same floor area.

Relocating wasn't the answer. The facility was purpose-built and well-suited to the work. What Norbar needed was more of it.

More Space, Same Building

PD Industrial's approach began with a detailed consultation and a thorough study of the existing structure. This is where manufacturer independence and genuine design capability matter: we weren't trying to sell Norbar a standard mezzanine solution. We were solving a specific problem in a specific building for a specific operation.

The building offered clear height that could be exploited. The structural slab was assessed for the additional loading that multi-level operations would impose. And Norbar's testing requirements — which needed distinct, accessible levels — shaped the configuration of the mezzanine into a multi-tier solution that effectively gave them an entirely new floor within the building envelope they already owned.

Integrated into the mezzanine design were new office spaces — removing the footprint pressure that office functions had previously created on the manufacturing floor — and warehouse partitioning to separate operational zones cleanly and efficiently.

The Result: A Facility That Could Grow Again

Norbar's working area effectively doubled. Their testing processes became more efficient because they were operating on levels designed around how the work actually flows, rather than in spaces adapted from a single-level layout. And the investment in the existing building, rather than in a new one, delivered a significantly better return than a relocation would have.