Farmfoods — 30,000 Pallet Locations in 12 Weeks

Farmfoods — 30,000 Pallet Locations in 12 Weeks

Farmfoods — 30,000 Pallet Locations in 12 Weeks

Sometimes the Old Has to Go Before the New Can Arrive

Farmfoods is one of the UK's most recognisable frozen and chilled food retailers — a business built on the efficient storage and distribution of food products across a national network. When they needed to reconfigure a major storage facility to accommodate new pallet racking, the obstacle was the existing mezzanine floor: 100,000 square feet of structural steel that occupied the very space the new racking needed.

The brief was straightforward in its description and complex in its execution: remove the mezzanine, install the racking, hand over a fully operational new storage facility — in 12 weeks.

Mechanical Demolition: The Only Way to Move at Speed

A 100,000 square foot structural mezzanine cannot be dismantled in any meaningful timeframe by hand alone. PD Industrial deployed mechanical plant — purpose-selected for controlled mezzanine demolition in an enclosed warehouse environment — to strip the structure in two weeks. Two weeks for 100,000 square feet: that is the difference between having the right equipment and a plan, and having an unrealistic programme.

With the mezzanine cleared and the floor reinstated where required, the racking installation began immediately. 30,000 new pallet locations, designed to Farmfoods' operational requirements, were supplied and installed within the remaining ten weeks of the programme.

End to End in Twelve Weeks

Strip-out complete. Racking installed. 30,000 pallet locations operational. Total programme: 12 weeks. This is what a contractor with both the demolition and the installation capability — genuinely in-house — can deliver when the programme demands it.

The cold store and chilled food sector is one of PD Industrial's most active areas of work. The demands of the environment — mechanical demolition in cold conditions, racking specified for food storage, installation coordinated around refrigeration plant — are precisely the kind of complex operational context that our experience and manufacturer independence equip us to handle.